Design and Construction Making the impossible Possible Free consultation

Crosby, Texas

Design and permit drawings in Crosby

Near the San Jacinto River, Crosby has room to build: homes on acreage, barndominiums, shops and barns. We design them and prepare the drawings for Harris County.

Rendering of a driveway seating garden with boulders, gravel and a water feature by A1 Design and Construction

Permits in Crosby

Crosby is unincorporated, so Harris County's Office of the County Engineer handles permits. New homes on septic go through the county's residential construction and septic permit, which needs a site evaluation by an engineer or registered site evaluator, a septic design site plan and, for lots outside a recorded subdivision, a survey; the county lists about 30 business days to process it. Work in the floodplain needs a floodplain development permit and a finished-floor elevation certificate after construction.

What we design in Crosby

  • Custom homes on acreage
  • Barndominiums and metal shop houses
  • Barns, shops and garages
  • Additions and remodels
  • Site plans and driveways
  • Landscape and irrigation plans

Some of our work

Driveway seating gardenBoulders, gravel & water featureLandscape
Metal shop houseBarndominium · roll-up doorsResidential
Metal building framePre-engineered steel · 3D viewIndustrial
Stone ranch homeStone, stucco & garage wingResidential
Ranch home entry gardenTimber steps, boulders & native plantsLandscape
Outdoor kitchenGrills, bar & ceiling fanResidential

See all projects

1 / 1

How it works

  1. ConsultA free first meeting and a site visit. We listen for what you need, your budget and your timeline.
  2. We design itConcept plans, elevations and renderings you can react to early, while changes are still easy.
  3. We engineer itStructure, MEP, site and irrigation, engineered and checked against code. When a job needs it, such as industrial or complex commercial work, we engineer it with our partners.
  4. PermitA complete, coordinated drawing set, ready for permitting and bidding. We handle the permit process for you and expedite it until it is approved.
  5. We build itWe build it, or we support your builder until it stands.

Questions

How long does a Harris County septic and building permit take?

The county lists about 30 business days for the residential construction and septic permit. We prepare the site plan and drawings so it goes in complete.

Do you design barndominiums in Crosby?

Yes. We design barndominiums, shops and metal buildings on acreage, with the site plan and the drawings for the county.

Let's draw your project.

Your first consultation is free. Tell us what you want to build, and we will tell you what it takes.